Kumasi Water Supply Project (Additional Works)

The total estimated cost for the Kumasi Water Supply Project was 24 million Euros.

The scope of works of the project included the laying of 400mm HDPE pipeline on the Kumasi ring main, supply and installation of transformer at the KNUST Booster Station, fencing of reservoir site at Prempeh College and the replacement of 9 inches cast iron pipeline between Suame Roundabout and Komfo Anokye Teaching Hospital.